Our references

The Castellanza railway, electrified and illuminated with Tais sockets, Tunnel 54 enclosures and Rino ceiling light fixtures

Electrical and lighting system of the tunnel with Tais, Tunnel54 and Rino series

The Castellanza tunnel is 3,300 meters long and goes down to a maximum depth of 22 meters to pass the Olona river in the sub-bed.

The Castellanza Railways represent a high risk profile at an electrical level that requires:

Why choosing Palazzoli products?

The materials used for this installation are completely non-deformable under temperature variations and in the presence of vibrations.

 

Go to TUNNEL 54 series
 
 
Go to TAIS series

Products used